++ These are meant for those of you at sea doing steam-time now!
++ You need to complete six assignments at sea.
++ Either do six assignments from the suggested list below -- one from each topic -- or you may suggest your own assignments (in that case you need to check with me first...just send me a mail at Kalyan@sp.edu.sg ).
++ Table below lists the suggested assignments. Please note the submission should be based on your shipboard plant and NOT reproduction of information from books.
++ Don't forget that once you finish your sailing time, you need to seat for a 3-hour written examination at SMA and an oral examination at the MPA (both at 1st Class level)!
b) Safety valves on drum, superheater and desuperheater: construction, setting and operation.
c) Line drawing of the steam distribution system and rationale for the same.
d) Steam temperature control system: arrangement and operation.
f) Fuel oil to gas and gas to fuel oil change over: precautions and practices on board.
g) Safety systems incorporated in boiler combustion control.
h) Dual fuel burners: construction and operation.
j) Main condensate extraction pump: construction and operation.
k) Main feed pump: construction, safety devices and operation.
l) Main condenser: construction, regeneration arrangement, extraction arrangement, leak detection.
n) HP, LP and Astern turbine arrangement and steam piping expansion arrangement.
o) Turbine construction.
p) Safety devices on turbines.
r) Forced vaporizer: construction and operation.
s) LD compressor: construction and operation.
t) LNG safety: handling gas, how brought into engine room with double ducting and associated safety systems.
v) Changing over procedure for main condenser to auxiliary condenser.
w) Dumping system: system description and operational procedures.
x) Emergency steam plant operation with one boiler.
y) Emergency steam plant operation with one turbine.
No comments: